ABOUT OUR
COMPANY

Gulf Dredging, Pioneer and Leaders in Dredging, Reclamation, Offshore Construction and Civil & Industrial Construction Works.

Gallery

Civil

Civil Projects

  • more details...Doha Power & Water Distillation (SWRO) ProjectName of the EmployerMinistry of Electricity & Water (MEW) / Doosan Heavy IndustriesMain ContractorGulf DredgingAddressP.O. Box 2031, Mishref, 40171, KuwaitTelephone No.00965-65766551Fax No.soo-bum.lee@doosan.comContact ReferenceMr. Soo Bum Lee – General Site ManagerStarting DateJanuary, 2017Completion DateOctober, 2018
    Civil Works includes
    • Site Preparation, Intake Pumping Station, Pipe Route, External Cable, Cable Route, Permeate & Back Flow Tank, Re-carbonation Plant, Service Water Tank & Fire-fighting Water Tank, Sludge Treatment Plant, Discharge Pipe Line (Site to Seal Weir Pit), Seal Weir Pit, Discharge Pipe (Seal Weir Pit to Outfall), LP/HP Product Water Line, Outfall System, Utility System, Fire-fighting System, Road & Paving, Drain System, Chlorine Dioxide Dosing System, Lighting & CCTV, Fence & Gate etc...
    • Building works includes
    • RO Building , Substation and Control, Local SWGR Buildings (3 Bldgs), Store, Lab and Workshop, Admin Building with Shelter, Mosque, Pipe Rack & Parking Shed, Chemical dosing Shelter, Limestone storage, DAF Sludge treatment bldg., CO2 Generation System, SW pump house
  • more details...Design, Construction, Completion & Maintenance of Chalets and Cafeteria of Police Officers ClubName of the EmployerMinistry of InteriorMain ContractorGulf DredgingAddressP.O. Box 1827, Safat 4400, KuwaitTelephone No.00965-2245 5407Fax No.00965-2245 5408Contact ReferenceGeneral AdministrationStarting DateSeptember, 2016Completion DateMay, 2018
    Scope of Works
    • Design, Construction, Furnishing and Maintenance of 72 nos. Normal Chalets consists of 2 floors, with a total area of approximately 182.25 m2 each.
    • Design, Construction, Furnishing and Maintenance of 4 nos. VIP Chalets consists of 2 floors, with a total area of approximately 272 m2 each.
    • Design, Construction, and Maintenance of the Cafeteria building, with a total area of approx. 300 m2
  • more details...New Gathering Center (GC-30) Name of the EmployerKuwait Oil Company / Larson & ToubroMain ContractorGulf DredgingAddressL&T House, Ballard Estate, Mumbai, IndiaTelephone No.0091-22-6705 3608Fax No.0091-22-6705 1980Contact ReferenceMr. Rajesh VarmaStarting DateOctober, 2015Completion DateDecember, 2017
    Scope of Works
    • Excavation and Backfilling works
    • Concrete works for Civil & Building works
    • Asphalt Road Works
    • Low Security Fence with Gate
    • Construction of
      • Control building,
      • Main Substation building,
      • Crude Pump House Substation Building,
      • TV Gas Compressor substation building,
      • Security Equipment Building,
      • Stand by Generator Building,
      • Security Guard House Building,
    • Water Supply, Drainage & Sanitation of buildings
    • Finishing works of the building
  • more details...New Gathering Center (GC-29) Name of the EmployerKuwait Oil Company / PetrofacMain ContractorGulf DredgingAddressPetrofac House, Al Khan Road, P.O. Box 23467, Sharjah, UAETelephone No.00971-6-574 0000Fax No.00971-6-518 4121Contact ReferenceMr. S. K. SharmaStarting DateApril, 2015Completion DateDecember, 2017
    Scope of Works
    • Excavation and Backfilling works
    • Concrete works
    • Concrete works for Civil Works
    • Foundations include;
      • Pipe rack foundation,
      • Pipe sleeper foundations,
      • Pipe support Foundations,
      • Shelter foundations,
      • Heater Foundations
      • Foundations for E& I
    • Culvert, manholes, valve pits, drain sumps
    • Concrete pavement
    • Asphalt Road Works
    • Low Security Fence with Gate
  • more details...MGT (Manifold Group Trunk Line) system for GC's 29, 30 & 31Name of the EmployerKuwait Oil Company / PetrofacMain ContractorGulf DredgingAddressPetrofac House, Al Khan Road, P.O. Box 23467, Sharjah, UAETelephone No.00971-6-574 0000Fax No.00971-6-518 4121Contact ReferenceMr. S. K. SharmaStarting DateApril, 2016Completion DateDecember, 2017
    • Procurement & construction of civil works related to pipeline installation to GC-29, 30 & 31.
    • Survey, ROW construction,
    • Trenching, Bedding, Padding and Backfilling for pipelines,
    • Other crossing, culvert construction,
    • Gatch & Asphalt roads.
    • In addition duct banks, hand holes,
    • sump pit, Anchor Block Foundations,
    • Guard Rail Installations,
    • Motorized Gate Installation etc.
  • more details...Construction of New Houses at South Ahmadi, KuwaitName of the EmployerKuwait Oil CompanyMain ContractorGulf DredgingAddressP.O. Box 9758, Ahmadi-61008, Ahamdi, KuwaitTelephone No.00965-2398 9111Fax No.00965 2398 3661Contact ReferenceTeam LeaderStarting DateDecember, 2013Completion DateDecember, 2018
    Scope of Works
    • The scope of works includes supply, build and construct 160 nos. of new houses in South Ahmadi having a total site area of 124,696 m2 comprise of the following;
      • Villa Type T1 – 434 m2 area
      • Villa Type T2 - 434 m2 area
      • Utility Buildings Type U1 – 650 m2 area
      • Utility Buildings Type U2 – 550 m2 area
      • Substation Type S1 – 625 m2 area
      • Substation Type S2 – 260 m2 area
      • Substation Type S3 – 260 m2 area
      • External Works of 52,800 m2 of total area including:
    • Roads & all Infrastructure works
    • Hard & Soft landscaping
    • Associated utility service
  • more details...Clean Fuel Project, CFP-MAB02 Area-3, KuwaitName of the EmployerKuwait National Petroleum Company / FDH (Fluor, Daewoo, Hyudai Heavy Industries (HHI))Main ContractorGulf DredgingAddress15th Floor, Al Sour Tower, Al Soor Street, Al Qiblah, KuwaitTelephone No.00965-2291 5354Fax No.00965-2291 5355Contact ReferenceKwang Yong Park – Construction ManagerStarting DateApril, 2015Completion DateJuly, 2017
    Scope of Works
    • The works includes excavation & backfilling (Mechanical & Manual), disposal of soil, trench excavation, crushed stone, concrete works for concrete paving, rebar works, formworks, dikes, pits, paving, pipe works, miscellaneous steel works such as fence, stair, handrail, grating and manhole covers.
    • Concrete – 92,243 m3
    • Excavation - 535,313 m3
    • Backfilling – 674,456 m3
    • Disposal surplus – 210,657 m3
    • more details...New Acid Gas Removal Plant (NAGRP) ProjectName of the EmployerKuwait National Petroleum Company/ TecnimontMain ContractorGulf DredgingAddressViale Monte, Grappa 3, 20124 Milan, ItalyTelephone No.00965-2326 3788Fax No.00965-2326 3668Contact ReferenceProject ManagerStarting DateMarch, 2011Completion DateJuly, 2015
      Scope of Works
      • Construction of Temporary Construction Facilities Units to be installed inside the refinery - A:
        • AREA #1(partial):First Aid, local parking lots and Temporary Lay down Area
        • AREA #2:Temporary Lay down Area
        • AREA #3:Contractor and Company Project Offices and Utilities
        • AREA #4:Subcontractor TCF Area
        • Units to be installed outside the refinery- B:
          • Contractor Warehouse and Lay down area
          • Civil Works for the NAGRP, Offsite & Utilities, NAGRP Shut down and Offsite/Inter connecting
          • Site Preparation including Roads, Pavements and Temporary Fencing
          • Reinforced Concrete Foundations for equipment and Pipe Rack
          • Demolition of existing buildings on the new AGRP site
          • Revamp of existing AGRP Project (Optional)
          • Building Works
          • The following buildings shall be provided
          • Sub Station M75
          • Instrumentation Building
          • Operator Building
          • New prefabricated Sub-station for the new Boiler 8, M60 Substation ,UPS Building
          • MEW Substation (Optional)
      • more details...New Booster Station (BS-171) at West KuwaitName of the EmployerSaipem / Kharfi NationalMain ContractorGulf DredgingAddressP.O. Box: 24081 Safat ,13101 KuwaitTelephone No.00965-2225 9000Fax No.00965-2225 9999Contact ReferenceProject ManagerStarting DateOctober, 2010Completion DateFebruary, 2017
        Scope of Works
        • The work comprises of the civil, structural, mechanical, painting, insulation, electrical, instrumentation and telecommunication works relevant to the Temporary Facilities, Civil and Building Works for the new Booster Station BS-171 at West Kuwait
        • Temporary Construction Facilities: The scope of works for Temporary Construction Facilities is to supply and erect Offices and services to Company at Central Area (BS-171) and Slug catcher area on site inside KOC premises. To supply and erect Offices and services to Main Contractor (M/s Saipem) at Central Area (BS-171) and Slug catcher area, Ware house and Main Storage Yard for Contractor at Central Area (BS-171) on site inside KOC premises
        • Civil Works: Concrete Sleepers, Pipe Rack Foundations, Equipment Foundations, Shelter Foundations, Culvert, Road Crossing and Duct Bank, Other Misc. Foundations
        • Control Building: Ground Plus first Floor having 2090.00m2 floor area
        • Main Substation Building: Ground Plus first Floor having 2150.00m2 floor area
        • Laboratory Building: Single story having 2150.00m2 floor area
        • Process Area Substation Building: Ground plus first floor having 5193.00m2 floor area
        • HSE Building: Single story building having 181.00m2 floor area
        • more details...Installation of Low Sulphur Fuel Oil (LSFO), FG and Gas Oil Pipeline from MAA to Subiya & Doha Power Stations Name of the EmployerKuwait Oil Company Main ContractorHEISCOAddressP.O. Box 21998, Safat 13080, KuwaitTelephone No.00965- 2462 4000Fax No.00965- 2483 0291Contact ReferenceProject ManagerStarting DateJanuary, 2011Completion DateJune, 2013
          Scope of Works
          • Supply and construction works of Grading of ROW, Excavation, sand bed, backfill, remove surplus Excavated material including disposal at the Designated area/yard, Final cleanup of ROW Subkha special section ROW, open trench cased Gatch Road crossings, open trench cased asphalt Road crossings, dewatering, etc.
          • more details...Sabah Al Salem University (Infrastructure Package)Name of the EmployerKuwait University Main ContractorGulf DredgingAddressJamal Abdul Nasser St, KuwaitTelephone No.00965-2484 5839Fax No.00965-2484 8648Contact ReferencePresident KU Construction ProgramStarting DateApril, 2010Completion DateNovember, 2012
            Scope of Works
            • The Scope of work generally includes the construction, completion and maintenance of the excavation and temporary works necessary for the Infrastructure and Landscaping Works for Sabah Al – Salem University City, Kuwait University.
            • The project comprises of the following:
              • Demolition of the existing Buildings and structures on site
              • Carefully remove & relocate all existing structures and all associated to location as directed by the Engineer
              • Raising top of manholes
              • Advertisement Hoardings
              • Earth Works including site stripping, excavation, backfilling, stockpiling, and Collapse soil remedy, total 10,000,000 m3
              • Supply erection & maintenance of security fence
              • Supply erection and maintenance of chain link fence around plant nursery
              • Landscape & Irrigation System
            • more details...Shuaiba Co-generation Distillation & Power Plant Name of the EmployerMinistry of Electricity & WaterMain ContractorFISIA Italimpiia / M.A. KharafiAddressP.O. Box 886 Safat,13009 Kuwait. Telephone No.00965-24813622/5Fax No.00965-24811861Contact ReferenceProject ManagerStarting DateApril, 2008Completion DateJune, 2012
              Scope of Works
              • Civil and building works
              • Temporary facilities
              • Onshore pipeline works includes civil construction of seawater intake pump houses
              • Outfall structures foundation for distillation units and auxiliaries
              • Construction of main and local switchgear building and other building works
              • Infrastructure works
              • Roads and pavements including:
                • subgrade and formation, base course, concrete roads, concreate paving, traffic marking and signs, precast concrete pavers, kerbs, gravelling, fencing etc..
                • Pipe conduits for underground cable way
                • Ground earthling system etc..
              • more details...Handicraft and Small Scale Industries ComplexName of the EmployerAl Waseela Trading & Contracting CompanyMain ContractorGulf DredgingAddressSanabil Tower, Floor-40, Sharq, KuwaitTelephone No.00965- 22923000 Fax No.00965- 22923009Contact ReferenceProject ManagerStarting DateAugust, 2005Completion DateJune, 2006
                Scope of Works
                • Construction, completion and handing over of Handicrafts & small industries complex block B, C, E & F
                • more details...Construction, Completion of Central Market for Khaldiya Cooperative SocietyName of the EmployerKhaldiya Cooperative SocietyMain ContractorGulf Dredging AddressBlock 1, Ghazza Street, Khaldiya, KuwaitTelephone No.00965-2481 2666Fax No.00965-2481 2665Contact ReferenceProject ManagerStarting DateJanuary, 2005Completion DateJune, 2006
                  Scope of Works
                  • Construction, completion of new commercial building
                  • Asphalt works for internal roads and access roads
                  • Parking area
                  • Other utilities
                • more details...Head Quarter for Public Authority for Agriculture & Fish Resources Name of the EmployerPublic Authority for Agriculture & Fish ResourcesMain ContractorGulf DredgingAddressP.O. Box 21422, 13075 Safat, KuwaitTelephone No.00965-2476 1114Fax No.00965-2476 5551Contact ReferenceDr. Rashed Abdalla Al ShettyStarting DateMay, 2003Completion DateApril, 2005
                  Scope of Works
                  • Construction, completion and maintenance of Head Quarter for Public Authority for Agriculture and Fish Resources (PAAF)
                  • The main building (3 floor) divided into 8 zones of approx. are of 650 m2 / zone (total approx. 5,200m2)
                  • Construction of Auditorium for 230 persons
                  • Car parking for 250 cars and road works
                  • Underground utilities
                  • Infrastructure works
                • more details...Construction and Maintenance of Youth & SportsName of the EmployerPublic Authority for Youths & Sports (PAYS)Main ContractorGulf Dredging AddressP.O. Box 21421, 13075 Safat, KuwaitTelephone No.00965-2481 7069Fax No.00965-2481 8273Contact ReferenceProject ManagerStarting DateMarch, 2003Completion DateNovember, 2004
                  Scope of Works
                  • Construction, completion and maintenance of Youth Camps at Sulaibiya
                • more details...Construction, Completion and Maintenance of Administration Building for Kuwait MunicipalityName of the EmployerKuwait MunicipalityMain ContractorGulf Dredging AddressShuwaikh Industrial Area, KuwaitTelephone No.00965-2244 9001Fax No.00965-2244 9002Contact ReferenceProject ManagerStarting DateMarch, 2003Completion DateSeptember, 2004
                  Scope of Works
                  • Construction, completion and maintenance of administration building for the Kuwait Municipality
                  • Consist of:
                    • Construction of Basement + ground floor + 17 typical floors complete with high quality architectural and finishing works
                    • Supply and installation of all utility services including electrical, mechanical, plumping, fire fighting, HVAC and other specialty works
                    • Supply and construction of asphalt roads including office parking area complete with car sheds and traffic accessories
                    • Other auxiliary works
                • more details...Head Quarter for the High Committee for the Implementation of Islamic ShariaaName of the EmployerKuwait MunicipalityMain ContractorGulf Dredging AddressShuwaikh Industrial Area, KuwaitTelephone No.00965-2244 9001Fax No.00965-2244 9002Contact ReferenceProject ManagerStarting DateMarch, 2003Completion DateNovember, 2004
                  Scope of Works
                  • Construction, completion and maintenance of HQ building for the High Committee for the Islamic Shariaa.
                  • Consist of:
                    • Construction of Basement + ground floor + 8 typical floors complete with high quality architectural and finishing works
                    • Supply and installation of interior facades and curtain walls
                    • Supply and installation of all utility services including electrical, mechanical, plumping, firefighting, HVAC and other specialty works
                    • Supply and construction of asphalt roads including parking area complete with car sheds and traffic accessories
                    • Other auxiliary works
                • more details...Mazda Peugeot ShowroomName of the EmployerKuwait Automotive Imports CompanyMain ContractorGulf Dredging AddressArdiya, State of KuwaitTelephone No.00965-2473 3334Fax No.00965-2473 3335Contact ReferenceProject ManagerStarting DateNovember, 2000Completion DateMay, 2002
                  Scope of Works
                  • Construction & Completion of Mazda & Peugeot Showroom at Ardiya, Kuwait
                • more details...Temporary Dental Clinic at Jabriya CampusName of the EmployerKuwait Automotive Imports CompanyMain ContractorGulf Dredging AddressJabriya, State of KuwaitTelephone No.00965-2246 0585Fax No.00965-2246 1829Contact ReferenceProject ManagerStarting DateJune, 2001Completion DateApril, 2002
                  Scope of Works
                  • Construction, completion and maintenance of Dental Clinic for students & staff and administration & services including asphalt & Infrastructure works