Gulf Dredging, Pioneer and Leaders in Dredging, Reclamation, Offshore Construction and Civil & Industrial Construction Works.

Gallery

Offshore

Offshore Project

  • more details...Construction, Completion & Maintenance of Police Officers Club Marina, Abu Hassaniya, State of KuwaitName of the EmployerMinistry of InteriorMain ContractorGulf DredgingAddressP.O. Box 1827, Safat 4400, KuwaitTelephone No.00965-2245 5407Fax No.00965-2245 5408Contact ReferenceGeneral AdministrationStarting DateJune, 2014Completion DateApril, 2017
    Scope of Works
    • Dredging of channel and basin and coastal land reclamation of area 5 hectors.
    • Design, fabrication, supply & installation of heavy duty concrete pontoon total length of 100m, complete with accessories, electro-mechanical and utility services.
    • Design, supply & construction of tem. Jetty.
    • Supply & construction of coast guard control & administration building with all facilities.
    • Supply & installation of navigation & communication tower 62 mtr height complete with structural steel foundation works.
    • Supply & construction of breakwater and coastal protection with rocks and armour protected with pre-cast core-loc.
    • Supply & installation of berthing wharf with length of 620m by sheet piles and supply & install 50 nos. of tubular piles.
    • Supply & installation of offshore navigation aids including beacons, buoys and accessories.
    • Design, supply, installation and operation of temporary precast fabrication yard.
    • Providing offshore marine logistics and water born traffic facilities
  • more details...Gas Condensate Export System Project, Al Khafji, Kingdom of Saudi ArabiaName of the EmployerKuwait Gulf Oil Company (KGOC) / Technip – Abu DhabiMain ContractorGulf DredgingAddressP.O. Box 7657, Abu Dhabi, UAETelephone No.00971-2-611 6000Fax No.00971-2-611 6111Contact ReferenceChristophe Miegeville- Project DirectorStarting DateJuly, 2014Completion DateDecember, 2017
    Scope of Works
    • Supply and transportation of rock to site
    • Trenching, backfilling and rock dumping works near shore Al Khafji (1.2 km)
    • Trenching, backfilling and rock dumping works near shore Al-Zour (1.7 km)
    • Rock dumping works in offshore shipping channel 92.0km)
    • Pre and Post trenching survey
    • Trench maintenance
    • Disposal of material and site cleaning
  • more details...Seawater Intake Channel Maintenance Dredging at Subiya Power StationsName of the EmployerMinistry of Electricity & WaterMain ContractorGulf DredgingAddressP.O. Box 12, Safat 13001, KuwaitTelephone No.00965-2489 6000Fax No.00965-2489 7484Contact ReferenceUnder SecretaryStarting DateSeptember, 2014Completion DateSeptember, 2017
    Scope of Works
    • Maintenance Dredging of Accumulated silt of approx. 1.00 million m³ at the Subiya Power Station Intake Channel including the Fore bay area.
  • more details...Az-Zour North Independent Water & Power Project, KuwaitName of the EmployerAz Zour Oula Power & Water / Hyundai Heavy Industries, South KoreaMain ContractorGulf DredgingAddressVilla 18, Street-1, Block-13, Bayan Area, KuwaitTelephone No.00965-6008 8696Fax No.ksj1994@hhi.co.krContact ReferenceProject Director (HHI)Starting DateJanuary, 2014Completion DateMarch, 2016
    Scope of Works
    • Demolish of Existing Jetty and Sheet Piles.
    • Construction of Shore Protection / Revetment approx. 750 mts including the temporary bund by using rocks and core-loc concrete blocks.
    • Construction of 100m temporary jetty by using pre-cast concrete block and remove it after project completion.
    • Dredging & Trenching 96,000 m3 and Reclamation 435,000m3.
    • Construction of Intake Pipeline 3 Rows GRP pipes 3000 mm dia, 240 meter length each.
    • Construction and installation of 3 nos. precast concrete intake head.
    • Construction of Intake Structure (W 50 x L 80 x D 17) meter.
  • more details...Al Khafji Crude Related Offshore Project – Shore Activities for Second Submarine Cable (SSPC)Name of the EmployerKhafji Joint Operations / Technip – Abu DhabiMain ContractorGulf DredgingAddressP.O. Box 7657, Abu Dhabi, UAETelephone No.00971-2-611 6000Fax No.00971-2-611 6111Contact ReferenceDaniel Gelas - Senior Project ManagerStarting DateDecember, 2011Completion DateDecember, 2013
    Scope of Works
    • Design and engineering of Shore Approach and Shore pulling
    • Pre & Post trenching survey
    • Trenching including onshore, landfall and near shore sections from splicing box to KP 3.5km.
    • Trench maintenance
    • Installation of pulling winch, back anchor and other necessary equipment at shore and all related civil works at shore.
    • Installation of mattress above the existing cables / pipelines at crossing locations
    • Pulling and laying of the cable in trench
    • Post back fill and as-built survey.
  • more details...Mubarak Al Kabeer (Bubiyan) Seaport, Phase-1, Stage-2 Port works – Concrete PontoonName of the EmployerMinistry of Public Works / Hyundai Engineering & Construction CompanyMain ContractorGulf DredgingAddressP.O. Box 29, Jahra 01002, KuwaitTelephone No.00965-2481 2622Fax No.00965-2281 7698Contact ReferenceProject DirectorStarting DateOctober, 2012Completion DateMarch, 2014
    Scope of Works
    • Design, fabrication, supply & installation of 9 nos. of heavy duty concrete pontoon size 29mx10mx3.3m for 2 nos of floating pier with total length of 261LM, connecting 5 nos and 4 nos together length 145m and 116m respectively.
    • Fueling system for all boats
    • Cathodic protection
    Steel Walkway
    • 2 nos of steel walkway size 50mx2m
    Utility Services
    • 10 nos of despensers
    • 10 nos of utility post for water, power and telecom.
    • All other necessary piping and cabling
  • more details...Mubarak Al Kabeer (Bubiyan) Seaport, Phase-1, Stage-2 Port works – Dredging WorksName of the EmployerMinistry of Public Works / Hyundai Engineering & Construction CompanyMain ContractorGulf DredgingAddress140-2, KYE-Dong, Chongro-Ku, Seoul, KoreaTelephone No.00965-2481 2622Fax No.00965-2281 7698Contact ReferenceProject DirectorStarting DateApril, 2011Completion DateSeptember, 2013
    Scope of Works
    • Dredging for the Access, Small Boat Harbour upto -8 m depth and dredging for the berthing box upto -16m depth total quantity 5.2 million m3
    • Pre and Post Bathymetric survey
  • more details...Sheikh Jaber Al Ahmed Al Sabah Causeway Project – Dredging WorksName of the EmployerMinistry of Public Works / Hyundai Engineering & Construction CompanyMain ContractorGulf DredgingAddress140-2, KYE-Dong, Chongro-Ku, Seoul, KoreaTelephone No.00965-2481 2622Fax No.00965-2281 7698Contact ReferenceProject DirectorStarting DateJuly, 2013Completion DateJanuary, 2014
    Scope of Works
    • Dredging of 5.24 million m3 at temporary access channel.
    • Pre and Post Bathymetric survey
  • more details...Enhancement of North Pier Facilities in MAA RefineryName of the EmployerKuwait National Petroleum Company (KNPC)Main ContractorGulf DredgingAddressP.O. Box 70, Safat 13001, KuwaitTelephone No.00965-2326 1888 / 2326 2888Fax No.00965-2326 2697Contact ReferenceTeam LeaderStarting DateMarch, 2012Completion DateDecember, 2013
    Scope of Works
    • Repair of existing road, construction of new road, new road signage and marking, Kerb-stones
    • Repair of bund walls around oil tanks, Leveling and compacting of the north pier yard, constructing new walkways around pumps area and manifold pits.
    • Demolition of existing mosque and constructing new mosque. Supply and construction of new car shelters K-Span type.
    • Full renovation for offshore (recreation) multistory building (steel structure). Supply and installation of Biological Treatment Sewage Tanks at recreation building and at selected areas on loading pier,
    • Fabrication, supply and installation of galvanized platforms for the septic tanks, supply and install of additional guard rails at loading pier,
    • Supply and installation of new multilayer cable trays different sizes and placement of elec., telecom cables.
    • Repair / replacement of corroded steel members and steel supports at sea water pumps house and shaft rooms,
    • Misc. electromechanical works
  • more details...Mubarak Al Kabeer (Bubiyan) Seaport, Phase-1, Stage-1 (Road, Bridge and Soil Treatment Works)Name of the EmployerMinistry of Public WorksMain ContractorCHEC-GD-Galfar JVAddressMinistries Zone, South Surra. KuwaitTelephone No.00965-2538 5520Fax No.00965-2539 5532Contact ReferenceUnder SecretaryStarting DateSeptember, 2007Completion DateDecember, 2017
    Scope of Works
    • Design, construct & maintain a 3-lane dual carriage way connecting to the proposed Boubyan Seaport with the main land involves
    • Construction of road & railway embankment about 29,000 m length involves, Ordnance clearance
    • Ground Improvement using vertical drain
    • Placing of Geo-textile, fill material, sub-base, asphalt paving, road marking, drainage system
    • Placing of rock on fill slope
    • Chain link and robust fence
    • Landscaping and street lighting works
    • Construction of 1,500 m length road & railway bridge across the channel, which consists of, driving of piles
    • construction of pier columns, abutments, retaining walls
    • Supply & installation of pre-cast concrete box girder & “T” beam
  • more details...Maintenance of Fishing Berths at Shuwaikh PortName of the EmployerKuwait Port AuthorityMain ContractorGulf DredgingAddressPort Complex, Jamal Abdul Nasser St, Kuwait CityTelephone No.00965-2481 2622Fax No.00965-2481 7698Contact ReferenceHarbour MasterStarting DateAugust, 2009Completion DateSeptember, 2012
    Scope of Works
    • Removal of existing utilities (Bollard, Rubber & Timber fender, Electric lights, Cables and Plumbing works) and hand over to KPA
    • Demolishing of existing slab concrete and disposal into approved disposal location
    • Cleaning of seabed under the slab
    • Removal and disposal of damaged precast concrete pile
    • Cleaning of existing concrete pile under the beam portion and repairing
    • Repairing of existing concrete pile cap beam
    • Supply and installation of Precast concrete “TT” deck slab and edge beam
    • Supply and placing of Cast-in-situ concrete on top of deck slab and edge beam
    • Supply and Installation of Pre-stressed Precast concrete pile (Size 360 mm x 360 mm x 17m length)
    • Supply and Installation of Rubber and Timber Fender
  • more details...Construction, Completion and Maintenance of Coast Guard Stations at Umm Bab, QatarName of the EmployerPublic Authority, QatarMain ContractorAl Sraiya Trading & Cont. Co.AddressIbn Seena St, Doha, QatarTelephone No.00965-4441 1800Fax No.00965-4444 2264Contact ReferenceMr. Antonie Saade – General ManagerStarting DateJanuary, 2010Completion DateApril, 2012
    Scope of Works
    • Construction of 1,000 mts length Cofferdam using of Temporary Fill Material
    • Supply and Installation of dewatering system
    • Excavation of Marina and channel area and disposal of excavated material in the approved disposal location
    • Construction of East, North and South Quay walls (about 280 mts) using Precast Concrete Blocks
    • Construction of 4 nos Finger Jetty (each 25 mts length) using precast concrete blocks
    • Supply & Installation of marine furniture’s such as stainless steel ladder, timber fender, bollards, and mooring rings
    • Construction of Boat Ramp
    • Supply and installation of Core rock, 80 – 200 kg under layer rock and 900 – 1900 kg armour rock for North & South Break walls construction
    • Supply and installation of 2 nos. navigational beacon and 3 nos. channel marker buoy
  • more details...Shuaiba Co-generation (Power & Distillation) Plant, Seawater Intake Pipeline ProjectName of the EmployerMinistry of Electricity & WaterMain ContractorFisia Italimpia, ItalyAddressVia de Marini, 16149 Genova GE, ItalyTelephone No.00965-2535 6206Fax No.00965-2535 6208Contact ReferenceMr. Lorenzo AdamoStarting DateMarch, 2008Completion DateAugust, 2009
    Scope of Works
    • Intake Pipe Line - Laying of 4 parallel lines each of 2000 mm dia GRP Pipes 800 mts length under the seabed with manholes at 100 mtrs intervals. The works included connecting the pipes to the Intake Structure at one end and the Riser rooms at the other end.
    • Supply and installation of 150 mm dia GRV Chlorination pipes inside 2000mm dia GRP Pipes.
    • Supply & Installation of Pre-cast Concrete Riser Room 4 Nos.
    • Shore Protection works.
    • Supply & Installation of Oil Boom Protection and Navigational Buoys 4 Nos.
    • 800 mts length Trench Dredging by Dipper Dredger and disposal of material by Hopper barge into the Sea
    • Backfilling of Trench after pipe laying using crushed Aggregates, Rocks
    • Onshore Pipelines
    • Protection and Navigational Buoys 4 Nos
  • more details...Renovation and expansion of Kuwait Regency Palace HotelName of the EmployerRegency Hotel & Hospital CompanyMain ContractorGulf DredgingAddressAl Bidea, 25 Al Ta'awen Street, Salmiya, KuwaitTelephone No.00965-2572 1099Fax No.00965-2572 3884Contact ReferenceMr. Jamal A. Ra Al Sane – CMDStarting DateSeptember, 2008Completion DateFebruary, 2009
    Scope of Works
    • Construction of breakwaters, flower boxes
    • Construction retaining wall and sand beach filling
  • more details...Renovation and Expansion of South Jetty at Al Khafji, Kingdom of Saudi ArabiaName of the EmployerAl Khafji Joint Operation (KJO)Main ContractorGulf DredgingAddressAramco, Khafji 39253, Saudi ArabiaTelephone No.00966-3 7766 1979Fax No.00966-3 766 2934Contact ReferenceMr. Mohammed Al Qatami – Project ManagerStarting DateNovember, 2005Completion DateJune, 2007
    Scope of Works
    • Dredging of the Inner Harbor Channel to a depth of -6 meters, 2.4 km in length from offshore to sand packet area with width varying from 90 meters to 180 meters. Dredging of sand packet area adjacent to the existing bridge to a depth of -7 meters
    • Renovation and expansion of existing South Jetty with Pre cast concrete Quay wall. Casting & Placing of Pre cast Concrete Blocks maximum weight up to 90 Tons, length of Quay Wall 1,100 meters Depth of Quay Wall -10.00m
    • Construction of Control Room/ Recreation Building, Guard House, Tide-Gauge House, Public Toilets and Package type Substation
    • Construction of four loading substations with metering facilities, sunshades, spill containment and Oily waste collection system and all Electro-Mechanical and Instrumentation works
    • Construction of SSD-1 fence including Gates with Integrated Access Control System and CCTV with night vision camera
    • Construction of Lay-down yard, illumination throughout jetties, telephones and loud speakers around the Jetty area
  • more details...Construction and Maintenance of Port and Associated Facilities for Coast Guard at Umm Al Maradem Island, Kuwait Name of the EmployerMinistry of Public WorksMain ContractorGulf DredgingAddressMinistries Zone, South Surra. KuwaitTelephone No.00965-2240 2500Fax No.00965-2539 5532Contact ReferenceChief Engineer, Special Building DepartmentStarting DateJuly, 2004Completion DateJanuary, 2006
    Scope of Works
    • Dredging of channel & Basin approx. 500,000 m3 coast land reclamation with area 5 hectors
    • Design, fabrication supply & installation of 6 nos. heavy duty concrete pontoons total length of 100m, complete with accessories
    • Design and construction of temporary jetty
    • Supply & construction of coast guard control & administration building including all electro-mechanical works with military standard facilities
    • Supply & installation of Navigation & communication tower 62m height completed with structural steel foundation
    • Supply & construction of breakwater and coastal protection (500 mts) with rocks and armour protected with pre-cast concrete core-loc
    • Supply & installation of berthing wharfs with total length of 620m by sheet piles
    • Supply & installation of 50 nos tubular piles
    • Supply & installation of navigation aids including beacons, buoys and accessories
    • Design, supply & installation and operation of temporary precast fabrication yard for core-loc
  • more details...Removal of Contaminated Layer and Ship Wrecks and Environmental Restoration Adjacent to Kuwait UniversityName of the EmployerMinistry of CommunicationMain ContractorGulf DredgingAddressP.O. Box 318, 11111 Safat, KuwaitTelephone No.00965-2481 9033Fax No.00965-2483 5968Contact ReferenceUnder SecretaryStarting DateFebruary, 2004Completion DateJanuary, 2006
    Scope of Works
    • Carrying out Geo Technical Studies to ascertain level of contamination
    • Dredging of 2.00 million cubic meter Contaminated Sediments from the Kuwait bay adjacent to the Kuwait University campus
    • Diversion of Outfall Culvert
    • Salvaging of 42 nos. of Sunken Ship wrecks
    • Environmental Restoration
    • Reclamation works of quantity 2.00 million cubic meter
  • more details...Messila Beach Hotel Package-2 – Marine WorksName of the EmployerAl Aziziah United General Trad. & Cont. Co.Main ContractorGulf DredgingAddressP.O Box 1368 , Safat 13014, Kuwait CityTelephone No.00965-2563 1209Fax No.00965-2562 9402Contact ReferenceMr. Tony Barlow – Owner RepresentativeStarting DateMarch, 2005Completion DateDecember, 2005
    Scope of Works
    • Construction of Breakwater
    • Supply and Installation of Tubular Piles
    • Wooden Decking
    • Forming of Slipways
    • Backfilling Works
  • more details...Dredging in Front of Berths and Small Boat Harbour at Shuaiba Port & Entrance Channel at Shuwaikh PortName of the EmployerKuwait Port AuthorityMain ContractorGulf DredgingAddressPort Complex, Jamal Abdul Nasser St, Kuwait CityTelephone No.00965-2481 2622Fax No.00965-2481 7698Contact ReferenceHarbour MasterStarting DateApril, 2004Completion DateDecember, 2004
    Scope of Works
    • Dredging in front of Berths 1 to 20 upto-14.00m level and the maneuvering area upto-14.50m level and also the Small Boat Harbour inside the Shuaiba Port
    • Dredging at the Entrance Channel at Shuwaikh Port
    • Total Dredging quantity 1.50 million cubic meter
  • more details...Seawater Intake Channel Maintenance Dredging at Subiya Power Stations Name of the EmployerMinistry of Electricity & WaterMain ContractorGulf DredgingAddressMinistries Zone, South Surra. KuwaitTelephone No.00965-2489 6000Fax No.00965-2489 7484Contact ReferenceUnder SecretaryStarting DateFebruary, 2002Completion DateJanuary, 2004
    Scope of Work
    • Maintenance Dredging of Accumulated silt of approx. 2.00 million m³ at the Subiya Power Station Intake Channel including the Fore bay area
  • more details...Kuwait Waterfront Development, Phase-V, Salmiya, KuwaitName of the EmployerUnited Reality CompanyMain ContractorGulf DredgingAddressP.O. Box : 2232, Safat 13023, KuwaitTelephone No.00965-180 5225Fax No.00965-2244 1003Contact ReferenceMr. Issam Huge Ali – Project Director EngineeringStarting DateMay, 2001Completion DateDecember,2003
    Scope of Works
    • Dredging for the marina with qty 800,000 m3 and reclamation of approx. 2.0 million m3 (60 hectors)
    • Supply & installation of breakwater & revetment for coast protection with rocks with total qty of 1,400,000 tons
    • Supply & formation of artificial beach by beach sand fill
    • Supply & construction of vertical wharfs wall by pre-cast concrete blocks, offshore pre-cast concrete culverts, crest wall blocks and expansion of existing concrete box culvert
    • Supply & construction of crest wall over a length of 3000 m in slipway
    • Supply & construction of reinforced concrete capping beam 294 mts
    • Supply & installation of 508 & 406 mm dia tubular guide piles and timber piles and installation of floating pontoon
    • Installation of timber & rubber fenders
    • Supply & installation of electrical, mechanical works for utilities
    • Supply & installation of offshore navigation aids including beacons, buoys and accessories
    • Other auxiliary works
  • more details...Fahaheel (Al Khout) Waterfront Development, Fahaheel, KuwaitName of the EmployerTamdeen Real Estate CompanyMain ContractorGulf DredgingAddressP.O. Box : 21816, Safat 13079, KuwaitTelephone No.00965-188 2233Fax No.00965-2246 8882Contact ReferenceMr. Bassam Badar – Technical DirectorStarting DateOctober, 2001Completion DateJuly,2003
    Scope of Works
    • Dredging & reclamation of approx. 1.0 million m3
    • Filling works including soil stabilization using geo-grid and geo-textile filter material
    • Placing of rocks in breakwater, revetments of total quantity of 310,000 m3
    • Construction of vertical quay wall using precast concrete blocks for boat hoist
    • Offshore precast concrete culvert works
    • Placing of precast concrete crest wall in revetment
    • Supply and installation of steel tubular guide piles and tubular sleeve piles
    • Supply & installation of floating pontoons
    • Fenders & marine fixtures
    • Electrical, mechanical works and other utilities connections etc.
  • more details...Hilton Resort Project – Marine WorksName of the EmployerTouristic Enterprises Co.Main ContractorGulf DredgingAddressP.O.Box: 23310 Safat 13094 KuwaitTelephone No.00965-2565 2775Fax No.00965-2565 2367Contact ReferenceProject ManagerStarting DateApril, 1999Completion DateMarch, 2000
    Scope of Works
    • Dredging & Reclamation works
    • Beach filling using beach sand
    • Construction of shore protection / revetment, rock works
    • Supply & Driving Steel Tubular Piles
    • Construction of vertical Quay Wall using Pre cast Concrete blocks
    • Pre cast concrete Box Culvert works
  • more details...Subiya Power Station Project – Offshore WorksName of the EmployerMinistry of Electricity & WaterMain ContractorGulf DredgingAddressMinistries Zone, South Surra. KuwaitTelephone No.00965-2489 6000Fax No.00965-2489 7484Contact ReferenceUnder SecretaryStarting DateJanuary, 1994Completion DateDecember, 1997
    Scope of Works
    • Construction of Seawater Intake
    • Dredging of 1.50 million m³ at main intake channel
    • Filling in between sheet pile cellular wall
    • Reclamation at South of Power Station
    • Beach berms filling
    • Construction of Earth dikes reverted with rock
    • Design and construction of cellular wall sheet piles coffer dam and skimmer wall footbridge
    • Pre cast concrete Barrier Post with Concrete foundation for a length of 3000 meters (15,000 tons)
    • Cement sand mix Soil Stabilization for sub base
    • Asphalt Road work
  • more details...Amiri Diwan, Crown Prince & Prime Minister’s Diwan and Council of Ministers ProjectName of the EmployerMinistry of Public WorksMain ContractorGulf DredgingAddressMinistries Zone, South Surra. KuwaitTelephone No.00965-2240 2500Fax No.00965-2539 5532Contact ReferenceUnder SecretaryStarting DateMarch, 1993Completion DateFebruary, 1995
    Scope of Works
    • Dredging of lagoon area, marina and approach channel of 2.0 million m³
    • Reclamation and removal of explosive ordinance
    • Construction of 2.0 Km of Revetment Rock work
    • Construction of Marina Breakwater, 2 nos. Slipway
    • Extension to the existing concrete Culverts with Pre cast concrete
  • more details...Az Zour South Power Station – Offshore WorksName of the EmployerMinistry of Electricity & WaterMain ContractorGulf DredgingAddressMinistries Zone, South Surra. KuwaitTelephone No.00965-2489 6000Fax No.00965-2489 7484Contact ReferenceUnder SecretaryStarting DateMay, 1983Completion DateSeptember, 1986
    Scope of Works
    • Construction of Seawater Intake Structure
    • Dredging of approx. 1.00 million m3 at Intake channel
    • Filling in between the Sheet Pile walls
    • Construction of two jetties
    • Supply & Driving of Sheet Pile Wall for a length of 4,800 meters
    • Construct Capping beam 4800 m long over the sheet pile jetty & Cement Pavement over a length of 2500 m
    • Shore protection with rock & Dolos
    • Construction of Intake bridge 120 m long & Fixed Oil Barrier 180m long
  • more details...Doha Intake Channel Dredging & Offshore Works Name of the EmployerMinistry of Electricity & WaterMain ContractorGulf DredgingAddressMinistries Zone, South Surra. KuwaitTelephone No.00965-2489 6000Fax No.00965-2489 7484Contact ReferenceUnder SecretaryStarting DateJanuary, 1980Completion DateDecember, 1981
    Scope of Works
    • Dredging of approx. 2.0 million m³ at the Seawater Intake channel
    • Filling in between the Sheet pile wall
    • Supply and Installation of Sheet Pile wall and Anchorage system together with Reinforced Concrete
    • Capping beam for a length of 2700 meters at Doha Power Station Project